User Tools

Site Tools


en:diary:dailyentriesworks

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
en:diary:dailyentriesworks [2026/09/01 12:29] – created Milanen:diary:dailyentriesworks [2026/09/10 13:08] (current) Milan
Line 1: Line 1:
-====== Daily Entries - Performed Works ======+====== Daily Entries - Works Performed ======
  
-=== Video for the Performed Works Section ===+=== Video for the Works Performed Section ===
 {{youtube>cqFztSwwmos?medium}} {{youtube>cqFztSwwmos?medium}}
- +\\ 
-$$==== Performed Works ==== +==== Works Performed ==== 
-To add an entry, use the **+ Add Entry** button, which opens the editing window. Enter a description of the work being performed in the **Description** field and fill in any other required fields according to the diary settings. The **Save and New** option saves the entry and clears the form for entering a new record; the **Save** option saves the entry and closes the window.+To add an entry, use the **+ New Entry** button, which opens the editing window. Enter a description of the work being performed in the **Description** field and fill in any other required fields according to the diary settings. The **Save and New** option saves the entry and clears the form for entering a new record; the **Save** option saves the entry and closes the window.
  
 <WRAP 100%> <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:dennizaznamyprace2.png?direct&400|}}+{{gallery>:en:diary:en_dennizaznamyprace2.jpg?direct&400|}}
 </WRAP> </WRAP>
  
Line 21: Line 21:
 \\ <WRAP 100%> \\ <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:dennizaznamyprac3.png?direct&400|}}+{{gallery>:en:diary:en_dennizaznamyprac3.jpg?direct&400|}}
 </WRAP> </WRAP>
  
-If the **Performed Works** module is active on the construction site and a budget has been uploaded, Performed Works can be entered using budget items. In this case, the **Item Description** field must be displayed in Diary Settings, on the Performed Works tab. The text of the selected item in the entry can be edited. The database retains the link to the original item, and editing the text does not break this link.+If the **Performed Works** module is active on the construction site and a budget has been uploaded, Works Performed can be entered using budget items. In this case, the **Item Description** field must be displayed in Diary Settings, on the Works Performed tab. The text of the selected item in the entry can be edited. The database retains the link to the original item, and editing the text does not break this link.
 <WRAP clear /> <WRAP clear />
  
Line 31: Line 31:
 \\ <WRAP 100%> \\ <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:dennizaznamyprace4.png?direct&400|}}+{{gallery>:en:diary:en_dennizaznamyprace4.jpg?direct&400|}}
 </WRAP> </WRAP>
  
-Especially for linear construction projects, the functionality for locating Performed Works on a map can be useful. To enable location data to be entered on the map for individual entries, the **Location** field must be displayed in Diary Settings, on the Performed Works tab.+Especially for linear construction projects, the functionality for locating Works Performed on a map can be useful. To enable location data to be entered on the map for individual entries, the **Location** field must be displayed in Diary Settings, on the Works Performed tab.
 <WRAP clear /> <WRAP clear />
  
Line 40: Line 40:
  
 \\ <WRAP 600px left> \\ <WRAP 600px left>
-{{gallery>:cs:diary:dennizaznamyprace5.png?direct&450|}}+{{gallery>:en:diary:en_dennizaznamyprace5.jpg?direct&450|}}
 </WRAP> </WRAP>
  
-It is also possible to locate work on the construction site by placing markers directly on a drawing. To use this functionality, the **Drawing** field must be displayed in Diary Settings, on the Performed Works tab, and at least one drawing must be uploaded under Construction Site Settings → **Construction Site Sections and Drawings**.+It is also possible to locate work on the construction site by placing markers directly on a plan. To use this functionality, the **plan** field must be displayed in Diary Settings, on the Performed Works tab, and at least one plan must be uploaded under Project Settings → **Project Sections and Plans**.
 <WRAP clear /> <WRAP clear />
  
  
 \\ <WRAP 600px left> \\ <WRAP 600px left>
-{{gallery>:cs:diary:dennizaznamyprace6.png?direct&400|}}+{{gallery>:en:diary:en_dennizaznamyprace6.jpg?direct&400|}}
 </WRAP> </WRAP>
  
-The **Drawing** icon on an entry indicates that the work has been linked to a drawing.+The **Plan** icon on an entry indicates that the work has been linked to a drawing.
  
 Similarly, the **Location** icon indicates that the entry has been linked to a location on the map. Similarly, the **Location** icon indicates that the entry has been linked to a location on the map.
Line 58: Line 58:
  
 \\ === Changing the Order of Entries === \\ === Changing the Order of Entries ===
-The Diary Administrator has permission to change the order of entries in the Performed Works (and Other Entries) section by dragging an entry to the desired position. This option can be disabled in Diary Settings. +The Diary Administrator has permission to change the order of entries in the Works Performed (and Other Entries) section by dragging an entry to the desired position. This option can be disabled in Diary Settings. 
-{{:cs:diary:zmenaporadizaznamu.png?600|}} +{{:en:diary:en_zmenaporadizaznamu.jpg?600|}}
-$$+
  
en/diary/dailyentriesworks.1788258595.txt.gz · Last modified: 2026/09/01 12:29 by Milan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki