User Tools

Site Tools


en:diary:diarysetup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
en:diary:diarysetup [2026/09/03 13:08] Milanen:diary:diarysetup [2026/09/18 08:20] (current) Milan
Line 12: Line 12:
 <WRAP 100%> <WRAP 100%>
  
-You can create a new diary from the **Diary List** using the {{cs:diary:btn_novy_denik.png?nolink|Create New Diary button}}+You can create a new diary from the **Diary List** using the {{en:diary:en_btn_novy_denik.jpg?nolink|Create New Diary button}}
  
-Another option is to **create a diary by copying** one of the existing construction site diaries. In addition to the settings, you can also copy the Authorized Persons. To create a diary by copying, use the {{cs:diary:btn_novy_denik_kopii.png?nolink|Create Diary by Copying button}}+Another option is to **create a diary by copying** one of the existing construction site diaries. In addition to the settings, you can also copy the Authorized Persons. To create a diary by copying, use the {{en:diary:en_btn_novy_denik_kopii.png?nolink|Create Diary by Copying button}}
  
 <WRAP clear /> <WRAP clear />
Line 20: Line 20:
 <WRAP 100%> <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:novydenik.png?direct&100%|New Diary window}}+{{gallery>:en:diary:en_novydenik.jpg?direct&100%|New Diary window}}
 </WRAP> </WRAP>
 In the **New Diary** window, enter: In the **New Diary** window, enter:
Line 40: Line 40:
 <WRAP 100%> <WRAP 100%>
 <WRAP 650px left> <WRAP 650px left>
-{{gallery>:cs:diary:provazane_deniky.png?direct&600|Linked Diaries}}+{{gallery>:en:diary:en_provazane_deniky.jpg?direct&600|Linked Diaries}}
 </WRAP> </WRAP>
 For diaries of the following types: For diaries of the following types:
Line 48: Line 48:
 additional information must be entered, such as **Construction Site Section Name**, **Short Construction Site Section Name**, and **Construction Site Section Number**. The meaning of these fields is clear from their names. additional information must be entered, such as **Construction Site Section Name**, **Short Construction Site Section Name**, and **Construction Site Section Number**. The meaning of these fields is clear from their names.
  
-The **Parent Diary** field allows you to create a hierarchical relationship between two diaries. This relationship then allows data to be copied from relevant subordinate diaries (see [[cs:diary:copysubcontractors|Copying Entries from Subcontractor Diaries and Construction Site Section Diaries]]).+The **Parent Diary** field allows you to create a hierarchical relationship between two diaries. This relationship then allows data to be copied from relevant subordinate diaries (see [[en:diary:copysubcontractors|Copying Entries from Subcontractor Diaries and Construction Site Section Diaries]]).
 <WRAP clear /> <WRAP clear />
  
Line 69: Line 69:
 <WRAP 100%> <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:nastaveni_deniku2.png?direct&600|}}+{{gallery>:en:diary:en_nastaveni_deniku2.jpg?direct&600|}}
 </WRAP> </WRAP>
  
Line 92: Line 92:
 <WRAP 100%> <WRAP 100%>
 <WRAP 600px left> <WRAP 600px left>
-{{gallery>:cs:diary:nastavenipocasi.png?direct&600|}}+{{gallery>:en:diary:en_nastavenipocasi.jpg?direct&600|}}
 </WRAP> </WRAP>
 **Field Name** - You can change the name of the section according to your needs. This has no effect on its functionality. **Field Name** - You can change the name of the section according to your needs. This has no effect on its functionality.
Line 135: Line 135:
 If you have a larger number of construction sites in Buildary and the default settings do not meet your needs, you can create one or more Project Templates where you can define your own template diary settings. A Project Template is created by a user with Domain Administration permissions. If you have a larger number of construction sites in Buildary and the default settings do not meet your needs, you can create one or more Project Templates where you can define your own template diary settings. A Project Template is created by a user with Domain Administration permissions.
 </WRAP> </WRAP>
-$$+
  
en/diary/diarysetup.1788433689.txt.gz · Last modified: 2026/09/03 13:08 by Milan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki