User Tools

Site Tools


en:diary:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
en:diary:start [2019/09/19 09:29] Administrátoren:diary:start [2024/09/27 09:25] (current) Lada Svobodová
Line 19: Line 19:
 Writing a construction diary is a legal obligation in some countries. In others, it is considered optional but very useful. Our solution meets the most demanding legislative requirements. Buildary supports certificate signature which is necessary for construction diary digital form in some countries. PDF report signed with a qualified certificate signature is a legally binding document which can stand as evidence during any litigation. Writing a construction diary is a legal obligation in some countries. In others, it is considered optional but very useful. Our solution meets the most demanding legislative requirements. Buildary supports certificate signature which is necessary for construction diary digital form in some countries. PDF report signed with a qualified certificate signature is a legally binding document which can stand as evidence during any litigation.
  
-===== Experiences and ideas for further development ===== 
-Our company has 25 years of experience in construction industry software. That does not mean we know everything and we have nothing to learn. Exactly opposite. We welcome and appreciate any feedback from our users and their suggestions for further development. We promise to take all the remarks seriously and analyse them thoroughly. We consider close cooperation with our users to be a key success factor. 
- 
-Do not hesitate to contact us, please. 
- 
-\\ 
  
en/diary/start.1568878194.txt.gz · Last modified: 2019/09/19 09:29 by Administrátor

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki