User Tools

Site Tools


en:diary:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
en:diary:start [2019/09/16 21:14] Administrátoren:diary:start [2024/09/27 09:25] (current) Lada Svobodová
Line 1: Line 1:
-====== Buildary help ======+====== Introduction ======
  
-  * [[:en:diary:introduction|Introduction]] +Buildary.online is an application designed to maintain a construction project diary in electronic form. Diaries are kept to provide a complete picture of the project, covering both the normal work processes and anything unusual that might have occurred on the project. The diary is used to document work progress, site conditions, labour and equipment usage, and the contractor’s ability (or inability) to perform his/her work., and can provide valuable information necessary to accurately reconstruct the events of the project in preparation of a claim. The diaries will become an important part of the project records if the project is subjected to audit, investigation, or litigation.
-  * [[en:diary:access|Application access]]+
  
-== Domain ==+Buildary.online as a cloud application grants access to any authorized person anytime and anywhere provided Internet connection is available. Buildary.online application is run in the Microsoft Azure cloud. Data is protected against unauthorized access, loss or abuse. Its data are guaranteed not to leave the territory of the European Union.
  
-  * [[:en:diary:domain|Domain]]+<WRAP group> 
 +<WRAP column 405px> 
 +{{en:diary:slider5_maly.jpg?nolink&400|Web site www.buildary.online}} 
 +</WRAP> 
 +We recommend that you launch the application from the site [[https://buildary.online|www.buildary.online]] where the latest application-related news and the best practice are published. 
 +\\
  
-== Project and diary set up ==+<WRAP column> 
 +</WRAP> 
 +</WRAP>
  
-  * [[:en:diary:projectsetup|Project set up]] +===== Legislation compliance ===== 
-  * [[:en:diary:diarysetup|Diary set up]]+Writing a construction diary is a legal obligation in some countries. In others, it is considered optional but very useful. Our solution meets the most demanding legislative requirements. Buildary supports certificate signature which is necessary for construction diary digital form in some countries. PDF report signed with a qualified certificate signature is a legally binding document which can stand as evidence during any litigation.
  
-== Daily Entries == 
-  * [[:en:diary:dailyentries|Daily entries]] 
-  * [[:en:diary:dailyreports|Daily reports]] 
-  * [[:en:diary:signing|Signing and locking]] 
-  * [[:en:diary:scannedcopy|Scanned attachments]] 
-  * [[:en:diary:nonworkingdays|Non-working days]] 
  
-== Diary identification == 
-  * [[:en:diary:diaryidentification|Diary identification]]  
- 
-== User permissions == 
-  * [[:en:diary:userpermissions|User permissions]]  
- 
-== Reports == 
-  * [[:en:diary:reports|Reports]]  
- 
-== Mobile application == 
-  * [[:en:diary:m_firststeps|First steps with mobile aplication]]  
-  * [[:en:diary:m_dailyentries|Daily entries]]  
-  * [[:en:diary:m_signing|Signing of daily entries]] 
- 
-{{page>admin:sidebar_@GROUP@}} 
en/diary/start.1568661242.txt.gz · Last modified: 2019/09/16 21:14 by Administrátor

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki