| **Project Time Zone** – the default time zone setting is suitable for projects in the Czech Republic and Slovakia. If you are building outside this area, select the appropriate time zone. This information is required for communication with the server regarding weather data. | **Project Time Zone** – the default time zone setting is suitable for projects in the Czech Republic and Slovakia. If you are building outside this area, select the appropriate time zone. This information is required for communication with the server regarding weather data. | ||
| - | **Modules Used** - you can select which Buildary.online modules you want to use on the Project. This applies to projects added to domains operating in Standard mode (see [[en: | + | **Modules Used** - you can select which Buildary.online modules you want to use on the Project. This applies to projects added to domains operating in Standard mode (see Domain and Billing System). For Project in domains operating in Individual mode, the user cannot change this setting. It is predefined at the domain level. **The module settings also affect the cost of using the Buildary service for the given Project.** |
| You can change the module settings at any time while working on the Project. An invoice for usage up to the date of the change will be calculated as of the date of the change. After that date, billing will be based on the new settings. For this reason, changing the settings more than once on the same day is not permitted. | You can change the module settings at any time while working on the Project. An invoice for usage up to the date of the change will be calculated as of the date of the change. After that date, billing will be based on the new settings. For this reason, changing the settings more than once on the same day is not permitted. | ||
| Line 84: | Line 84: | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 620px left> | <WRAP 620px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| If you are creating a Project with properties similar to another Project in the relevant domain, you can use the **New Project by Copy** function. This function is available from the **Project Settings** of the Project you want to copy, via the three-dot menu. | If you are creating a Project with properties similar to another Project in the relevant domain, you can use the **New Project by Copy** function. This function is available from the **Project Settings** of the Project you want to copy, via the three-dot menu. | ||
| Line 119: | Line 119: | ||
| \\ <WRAP 100%> | \\ <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| Line 129: | Line 129: | ||
| \\ <WRAP clear /> | \\ <WRAP clear /> | ||
| <WRAP 400px left> | <WRAP 400px left> | ||
| - | {{:cs:diary:ares_.png? | + | {{:en:diary:en_ares_.jpg? |
| </ | </ | ||
| <WRAP info> | <WRAP info> | ||
| Line 155: | Line 155: | ||
| \\ <WRAP 100%> <WRAP 600px left> | \\ <WRAP 100%> <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| Line 185: | Line 185: | ||
| - **HTML email** – when the construction site is closed, the user will receive an e-mail notification. | - **HTML email** – when the construction site is closed, the user will receive an e-mail notification. | ||
| - | **E-mail Notifications - Ticket Management** - see the description in the " | + | **E-mail Notifications - Ticket Management** - see the description in the " |
| - | **E-mail Notifications - Performed Works** - see the description in the " | + | **E-mail Notifications - Performed Works** - see the description in the " |
| <WRAP info> If the user is in the same domain as the construction site, they receive permissions on the construction site based on the permissions assigned to them at the domain level. | <WRAP info> If the user is in the same domain as the construction site, they receive permissions on the construction site based on the permissions assigned to them at the domain level. | ||
| Line 200: | Line 200: | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| Line 214: | Line 214: | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| In this code list, you can define the hierarchical structure of the construction site. Click the **+** button to add another subordinate level below the currently selected section. At the first level, we recommend structuring the construction site according to building objects. Building objects can then be divided into more detailed sections if required. | In this code list, you can define the hierarchical structure of the construction site. Click the **+** button to add another subordinate level below the currently selected section. At the first level, we recommend structuring the construction site according to building objects. Building objects can then be divided into more detailed sections if required. | ||
| Line 227: | Line 227: | ||
| \\ <WRAP 100%> | \\ <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| One or more plans can be added to each section. You can add plans to the project section window individually, | One or more plans can be added to each section. You can add plans to the project section window individually, | ||
| Line 264: | Line 264: | ||
| If you populate these code lists, their contents will be suggested when creating an entry in the relevant section. The lists can be created either by adding individual items using the **+ Add** button or by importing an entire list from an XLS file. To import an XLS list, the list must be on the first worksheet and must contain the exact column names. Hovering the mouse over the import button displays a tooltip with the required column names for each section. For people, for example: Name, Profession, Contractor. | If you populate these code lists, their contents will be suggested when creating an entry in the relevant section. The lists can be created either by adding individual items using the **+ Add** button or by importing an entire list from an XLS file. To import an XLS list, the list must be on the first worksheet and must contain the exact column names. Hovering the mouse over the import button displays a tooltip with the required column names for each section. For people, for example: Name, Profession, Contractor. | ||
| - | {{gallery>: | + | {{gallery>: |
| <WRAP info> Using code lists is not mandatory. They are simply an additional source of suggestions. Whether or not you use code lists, you can still enter data freely in the diary, and once an entry has been entered, it will be suggested the next time. | <WRAP info> Using code lists is not mandatory. They are simply an additional source of suggestions. Whether or not you use code lists, you can still enter data freely in the diary, and once an entry has been entered, it will be suggested the next time. | ||
| Line 274: | Line 274: | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 400px left> | <WRAP 400px left> | ||
| - | {{:cs:diary:vytvoritvzor.png?400|}} | + | {{:en:diary:en_vytvoritvzor.jpg?400|}} |
| </ | </ | ||
| Line 292: | Line 292: | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| When creating a new project, you can select **Project Templates** after selecting the domain and then choose the appropriate Project Template from the list. | When creating a new project, you can select **Project Templates** after selecting the domain and then choose the appropriate Project Template from the list. | ||