User Tools

Site Tools


en:diary:projectsetup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
en:diary:projectsetup [2024/09/30 14:34] Lada Svobodováen:diary:projectsetup [2024/10/02 09:36] (current) Lada Svobodová
Line 63: Line 63:
  
 After establishing the construction site, it is necessary to create a construction project team.  After establishing the construction site, it is necessary to create a construction project team. 
-You can add other companies with the button + New. Then fill in the details.+ 
 +=====Project Team Member===== 
 + 
 +The Members tab contains a list of people who form the project team of the construction project. Every person should be assigned to a particular company. 
 + 
 +You can insert new members using the button + New. 
 + 
 +The meaning of the data fields is obvious from their names. 
 + 
 +If a user already has a Buildary account, the telephone number will be taken from the information provided in the user accountPlease be sure that the user E-mail on the account and on the team member list do match. 
 + 
 +After inserting a new member of the project team, an invitation is sent to his/her E-mail address. From now on, the user has access to the project. 
 +{{:en:diary:project_team_member.png?600|}} 
 + 
 +===== Companies===== 
 +The tab Companies contains all the companies participating in the construction. The first entry in the company list is always automatically the company from the domain. You can add more companies by clicking the + New button
  
 {{gallery>:en:diary:company_list.png?direct&600|Company list window}} {{gallery>:en:diary:company_list.png?direct&600|Company list window}}
-{{:en:diary:company_details.png?600|}}+{{:en:diary:company_details.png?400|}}
  
 </WRAP> **Company role** - Select a role from a present list. Additional roles can be added on the Compan Role tab. </WRAP> **Company role** - Select a role from a present list. Additional roles can be added on the Compan Role tab.
Line 78: Line 93:
 You can expand the company information so that it's members can be seen. You can assign members to the company immediately when you create new project team members. Or you can do it any time later. You can expand the company information so that it's members can be seen. You can assign members to the company immediately when you create new project team members. Or you can do it any time later.
  
-===== Company Roles ===== 
  
-In this list, the most common roles of companies on the construction site are predefined. You can add your own roles, specific to your project. Company role can also be renamed. +===== Team Member Roles =====
-<WRAP info> If you rename the default roles on the list, try not to change the meaning of the role. We recommend creating new role than renaming the existing one. </WRAP>+
  
-===== Team Members=====+This window contains a list of roles for individuals on the construction site. Each role also defines their permissions.
  
-The ** Members ** tab contains list of people who form the project team of the construction project. Every person should be assigned to a particular company.+You can create your own roles or edit the default roles. Renaming default roles is recommended only if it is formal name change that does not alter the meaning of the role.
  
-You can insert new members using the icon {{cs:diary:btn_plus.png?nolink&|Tlačítko Přidat}} after filling in the edit line. 
  
-The meaning of the data fields is obvious from their names. 
  
-If a user already has a Buildary account, the telephone number will be taken from the information provided in the user account. Please be sure that the user E-mail on the account and on the team member list do match.+<WRAP 100%> 
  
-After inserting a new member of the project team, an invitation is sent to his/her E-mail address. From now on, the user has access to the project.+{{:en:diary:team_member_roles.png?400|}}
  
-<WRAP info> Access to the project doesn't mean that user can enter any dairyHe/she must be added to the diary as an authorized person to be able to enter and work in it. </WRAP>+<WRAP info> If you rename the default roles on the list, try not to change the meaning of the roleWe recommend creating new role than renaming the existing one. </WRAP>
  
-===== Team Member Roles ===== 
  
-<WRAP 100%> <WRAP 600px left> 
  
-{{gallery>:en:diary:team_member_roles.png?direct&600|Team member roles list}}+ <WRAP clear /> 
 + 
 + 
 +=====Company Roles===== 
 +In this list, the most common roles of companies on the construction site are predefinedYou can add your own roles, specific to your project. Company role can also be renamed.
  
-</WRAP> There is a list of roles that can be assigned to the team members in the project diaries. There are permissions defined with each role. + <WRAP clear />
  
-You can create custom roles or even edit default rolesRenaming default role is recommended only if it doesn't change the meaning of the role.+===== Project Sections and Plans ===== 
 +In this part, you have the option to define the hierarchical structure of the building. The + button adds another subordinate level below the currently selected part. At the first level, we recommend leaving the structure divided into building objects. Building objects can (or do not) be divided into more detailed partsAppropriate division of the construction will increase localization of tasks. Each part has an icon on the right with the number of drawings that part contains
  
-The meaning of each permission is described in detail in a separate help chapter "User Permissions"<WRAP clear />+{{:en:diary:project_section_plants.png?400|}}
  
-<WRAP info> A role is assigned to the user in the "Diary identification", "Authorized persons" section. </WRAP>+===== Code lists - Project Diary =====
  
-===== Other Entry Cotegories =====+===== Other entry categories ===== 
 +The code list is used to sort records in the Other entries section. Administrator has the option to edit the dial according to the needs of the given building. If the building was created using the Project Template, then the dial is taken from the model.
  
-<WRAP 100%> <WRAP 600px left>+{{:en:diary:code_list.png?400|}}
  
-{{gallery>:en:diary:other_entry_category_list.png?direct&600|Other entry category list}}+===== Labor on site, Plants and Materials =====
  
-</WRAP> There is a list of options which can be assigned to the diary entries in the "Other entry" section. This section contains the most important diary entries and these categories help you to organize and filter the entries easily. You can edit the existing or create new categories according to your needs.<WRAP clear />+If you fill in these codes, the contents of the code will be shown when recording in that section. The list can be created either by inserting individual items via the button +
  
 +{{:en:diary:labor_on_site.png?400|}}
  
en/diary/projectsetup.1727699672.txt.gz · Last modified: 2024/09/30 14:34 by Lada Svobodová

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki