en:diary:nonworkingdays
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| en:diary:nonworkingdays [2024/10/07 13:15] – Lada Svobodová | en:diary:nonworkingdays [2026/09/14 08:45] (current) – Milan | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Non-working days ====== | + | ====== Non-Working Days ====== |
| - | The term “Non-working day” is a day without data in Buildary. The day is locked. This day is skipped in signing sequence. | + | |
| - | The “non-working day” option can be found in the drop-down menu on the right-top side of the window. With this option, you will lock the selected | + | <WRAP 100%> |
| + | <WRAP 400px left> | ||
| + | {{: | ||
| + | In Buildary, the term **“Non-Working Day”** refers to a day that contains no data but is nevertheless a valid state. Examples include weekends or technological breaks in construction work. | ||
| - | A non-working | + | When you select a day, the drop-down menu on the right side of the window header contains the **“Non-Working Day”** option. This option allows you to lock the selected |
| - | Non-working days are underlined with the grey colour. | + | {{: |
| - | {{: | + | A Non-Working Day can be changed back to a working day using the same procedure. However, if the Non-Working Day has already been locked with an electronic signature, it **CANNOT** be changed back to a working day. |
| + | Non-Working Days are indicated by a **gray underline** in the header. | ||
| + | |||
| + | <WRAP clear /> | ||
| + | |||
| + | <WRAP tip> | ||
| + | Buildary does not allow you to lock a day with an electronic signature if it is preceded by a day that has not been electronically signed or has not been locked as a Non-Working Day. This is because the pages of the construction diary must be numbered sequentially. | ||
| + | |||
| + | Therefore, if a day is empty because no work was carried out on the construction site, mark it as a **“Non-Working Day”**. Otherwise, you will not be able to lock the subsequent days. </ | ||
| <WRAP info> | <WRAP info> | ||
| - | Buildary will not allow you to lock the day that precedes an empty or unlocked day. This is because the diary pages must be numbered sequentially. Therefore, the days must be locked one after another. | + | A day that has already been signed cannot |
| - | If the day is empty because there was no work on construction site performed, mark it as "Not-working day". | + | |
| </ | </ | ||
en/diary/nonworkingdays.1728299709.txt.gz · Last modified: 2024/10/07 13:15 by Lada Svobodová