| - | An unlimited number of diaries can be used on each project. Especially on large construction projects, it can be useful to use separate diaries for each construction part (subproject). For project general information the main project diary is used in this case. | + | |
| - | Important subcontractors can run their own independent diaries. Some special construction works may demand separate diaries too. Buildary makes all these options easy to manage. | + | |
| + | \\ Each construction site can have any number of diaries. Especially on large construction sites, separate diaries are maintained for each building object. Shared information at the construction-site level is then recorded in what is known as the central Project Diary. In practice, it is also common for major subcontractors to maintain their own Project Diaries. Sometimes it is appropriate to maintain separate diaries for certain special types of work that require this due to their nature. The **Buildary** application can easily handle all of these scenarios. | ||
| <WRAP info> | <WRAP info> | ||
| - | If you have a proven system | + | If you already |
| </ | </ | ||
| - | ===== Creating a new diary ===== | + | \\ ===== Creating a Diary ===== |
| + | |||
| + | <WRAP 100%> | ||
| + | |||
| + | You can create a new diary from the **Diary List** using the {{en: | ||
| + | |||
| + | Another option is to **create a diary by copying** one of the existing construction site diaries. In addition to the settings, you can also copy the Authorized Persons. To create a diary by copying, use the {{en: | ||
| + | |||
| + | <WRAP clear /> | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | You can access | + | In the **New Diary** window, enter: |
| + | |||
| + | **Diary Type** - select | ||
| + | |||
| + | ** Diary owner** - select the company responsible for maintaining the diary from the code list. | ||
| + | |||
| + | **Document Type** - information about the type of document on the basis of which the construction site is being carried out. | ||
| + | |||
| + | **Diary Start Date** - the start date of the Project Diary, usually the date when the construction site was handed over. The date can be set as needed, either | ||
| + | |||
| + | **Diary Finish Date** - after this date, daily entries can no longer be added. This field does not have to be filled in. | ||
| <WRAP clear /> | <WRAP clear /> | ||
| + | |||
| + | |||
| + | \\ ==== Specific Information for Certain Diary Types ==== | ||
| <WRAP 100%> | <WRAP 100%> | ||
| - | < | + | < |
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | List of diaries | + | For diaries of the following types: |
| + | * Project Diary /part of construction | ||
| + | * Subcontractor Diary | ||
| + | * Special Works Diary | ||
| + | additional information must be entered, such as **Construction Site Section Name**, **Short Construction Site Section Name**, and **Construction Site Section Number**. The meaning of these fields is clear from their names. | ||
| - | <WRAP info> If you need to create a diary as a copy of an existing | + | The **Parent Diary** field allows |
| + | <WRAP clear /> | ||
| + | |||
| + | |||
| + | \\ ===== Diary Settings ===== | ||
| + | |||
| + | Before entering data into the diary, | ||
| + | <WRAP 100%> | ||
| + | <WRAP clear /> | ||
| + | |||
| + | **Diary Settings** | ||
| + | * from the **Diary List** by clicking the pencil icon at the end of the row for the relevant | ||
| + | * if you are viewing the Daily Entries of a diary, simply click the **Diary Settings** button with the gear icon above the timeline, or | ||
| + | * select **Identification Details** in the left panel and then select the **Diary Settings** tab | ||
| + | |||
| + | The **Diary Settings** window contains tabs for configuring individual sections. The individual tabs are described below. | ||
| + | |||
| + | |||
| + | \\ ==== Basic ==== | ||
| + | <WRAP 100%> | ||
| + | <WRAP 600px left> | ||
| + | {{gallery>: | ||
| </ | </ | ||
| + | |||
| + | **Time Limit for Signature ** - specifies the time in minutes for which a Daily Entry or Other Entry will be temporarily locked after the **Download for Signing** function is initiated. The temporary lock ends either with a permanent lock (i.e. by signing the entry or uploading the electronically signed entry back into the application) or when the configured time expires and the entry returns to its active state. A file uploaded after the time limit has expired will be rejected. | ||
| + | |||
| + | **Number of Signature fields** - specifies the number of signature fields at the end of the entry being signed. According to common practice, the daily report is signed by the Site Manager and the Technical Supervision Representative (TDS), so two signature fields are configured by default. The number can be changed as needed. | ||
| + | |||
| + | **Working Hours** - the contents of this field are automatically inserted into the note in the Labour section when the first entry is added to this section. The note can be edited for individual days. | ||
| + | |||
| + | **Working Day Hours** - determines the number of working hours that will be offered by default for Labour and Plants in the Hours field. | ||
| + | |||
| + | **Other Entries Signature Check** - this field is checked by default and means that a day cannot be locked without signatures for all entries made by other people in the Other Entries section. | ||
| + | |||
| + | **Attendance Import** - this section is displayed only if the domain is connected to an electronic attendance system. You can then select the relevant terminal at the given construction site and, if necessary, filter the subcontractor diaries so that they include only people belonging to the given subcontractor. | ||
| + | |||
| + | **Section Order** - allows you to change the order of sections according to your requirements. | ||
| <WRAP clear /> | <WRAP clear /> | ||
| + | |||
| + | |||
| + | \\ ==== Individual Section Tabs - Common Information ==== | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | In the ** New Diary ** window, you can fill in the diary information. | + | **Field Name** - You can change the name of the section according to your needs. This has no effect on its functionality. |
| - | **Diary Type** - You can select the diary type from the list that suits you the best. Diary type affects sorting | + | **Abreviation** - allows |
| - | **Diary owner** - You can select a company | + | **Section Item Settings** – provides the list of available fields |
| - | **Parent diary** - It allows you to create a hierarchical link between 2 diaries, which then allows you to copy the data. | + | **Entry Timestamp** - displays the time when an entry was created and highlights entries created after the statutory deadline. |
| + | **Hide** = Do not display at all | ||
| + | **Show** = Simply display the date and time when the entry was created or last modified | ||
| + | **Required** = In addition | ||
| - | **Building permit** you can choose information about the type of document under which is the construction project carried out. | ||
| - | **Diary start date** Fill in the starting date of the diary. Daily entries | + | <WRAP info>The statutory deadline is 48 hours, excluding days marked as " |
| - | **Diary finish date** Fill in this day only when you want to close the diary. You can not write daily entries after this date. | + | <WRAP tip > |
| + | If you change any setting, save it using the **Save** button. **Each tab must be saved separately.** | ||
| + | </ | ||
| + | <WRAP clear /> | ||
| - | ===== Editing information and logo in the diary ===== | + | \\ ==== Individual Section Tabs - Specific Information |
| - | There are several ways to get into the settings diary: | + | === Weather === |
| + | **Weather entry hours** - In this tab, you set the full-hour times at which you want weather data to be retrieved. The default values are 6:00, 12:00, and 18:00. You can add additional times using the code list by clicking the selected time, or remove a time from the selected hours using the x button. A row containing weather data will then be generated for each selected hour in the daily entries. | ||
| - | - **Diary List** - you can find it in the left panel where you click on the edit pencil. Tab Diary settings. | + | **Siotech Sensor** - enter the device ID in this field if you use an autonomous Siotech temperature sensor (see [[en: |
| - | - **Daily | + | === Works Performed and Other Entries |
| - | - **Diary identification** - and then by selecting | + | In the Works Performed section, you can also enter records using budget items. To do this, you need to have the Project' |
| - | {{: | + | **Location** - displays a map showing the location to which the entry relates. The coordinates are loaded automatically from GPS (location services must be enabled on a mobile device), or the user can determine the location by clicking on the map. When the coordinates are loaded, the time at which they were obtained from GPS is also saved. |
| - | =====Diary | + | **Plan** - allows a drawing to be displayed for an entry and a marker to be placed on it by clicking on the location to which the diary entry relates. To use this function, plans of the construction site must first be uploaded to the Project Sections and Plans code list. |
| + | |||
| + | |||
| + | |||
| + | <WRAP tip > | ||
| + | If you have a larger number of construction sites in Buildary and the default | ||
| + | </ | ||
| - | **General** - The window contains data entered and explained in the diary creating help part. At the bottom part of the window, you can change the order of the diary sections using the arrows icons. The order changes for both the screen and the daily report in a PDF file. | ||
| - | {{: | ||