| - | An unlimited number of diaries can be used on each project. Especially on large construction projects, it can be useful to use separate diaries for each construction part (subproject). For project general information the main project diary is used in this case. | + | |
| - | Important subcontractors can run their own independent diaries. Some special construction works may demand separate diaries too. Buildary makes all these options easy to manage. | + | |
| + | \\ Each construction site can have any number of diaries. Especially on large construction sites, separate diaries are maintained for each building object. Shared information at the construction-site level is then recorded in what is known as the central Project Diary. In practice, it is also common for major subcontractors to maintain their own Project Diaries. Sometimes it is appropriate to maintain separate diaries for certain special types of work that require this due to their nature. The **Buildary** application can easily handle all of these scenarios. | ||
| <WRAP info> | <WRAP info> | ||
| - | If you have a proven system | + | If you already |
| </ | </ | ||
| - | ===== Creating a new diary ===== | + | \\ ===== Creating a Diary ===== |
| <WRAP 100%> | <WRAP 100%> | ||
| - | <WRAP 600px left> | ||
| - | {{gallery>: | ||
| - | </ | ||
| - | You can access the diary list by selecting the Diary list. You can find it in the left panel | ||
| - | <WRAP clear /> | ||
| - | <WRAP 100%> | + | You can create a new diary from the **Diary List** using the {{en:diary:en_btn_novy_denik.jpg?nolink|Create New Diary button}} |
| - | <WRAP 600px left> | + | |
| - | {{gallery>: | + | Another option is to **create |
| - | </ | + | |
| - | List of diaries contains | + | |
| - | <WRAP info> If you need to create a diary as a copy of an existing diary, you can use the button New Diary copy. When creating a diary as a copy, all the settings are copied from a chosen existing diary. You can decide to copy a list of authorized persons too. You can save a lot of configuration work this way. | ||
| - | </ | ||
| <WRAP clear /> | <WRAP clear /> | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | In the ** New Diary ** window, | + | In the **New Diary** window, |
| - | **Diary Type** - You can select the diary type from the list that suits you the best. Diary type affects | + | **Diary Type** - select the diary type that suits your needs from the list. The diary type affects the order in which diaries are displayed in the construction site diary list. |
| - | **Diary owner** - You can select | + | ** Diary owner** - select |
| - | **Parent diary** - It allows you to create a hierarchical link between 2 diaries, | + | **Document Type** - information about the type of document on the basis of which the construction site is being carried out. |
| - | **Building permit** you can choose information about the type of document under which is the construction | + | **Diary Start Date** - the start date of the Project Diary, usually the date when the construction |
| - | **Diary | + | **Diary |
| + | <WRAP clear /> | ||
| - | **Diary finish date** Fill in this day only when you want to close the diary. You can not write daily entries after this date. | ||
| - | + | \\ ==== Specific Information for Certain Diary Types ==== | |
| - | ===== Editing information and logo in the diary | + | |
| <WRAP 100%> | <WRAP 100%> | ||
| - | < | + | < |
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | Once you have filled in and saved the data in the New diary window, you can edit this information by selecting "Diary Information", | + | For diaries of the following types: |
| - | ** Left and Right Logo ** can be set for the diary. For newly created diaries, the left logo is taken from the domain settings, and the right logo is filled by Buildary.online default. An example can be seen in the picture. We recommend using white-coloured logos with a transparent background (eg. in png format). | + | * Project Diary /part of construction site/ (i.e. building-object |
| + | * Subcontractor | ||
| + | * Special Works Diary | ||
| + | additional information must be entered, such as **Construction Site Section Name**, **Short Construction Site Section Name**, | ||
| + | The **Parent Diary** field allows you to create a hierarchical relationship between two diaries. This relationship then allows data to be copied from relevant subordinate diaries (see [[en: | ||
| + | <WRAP clear /> | ||
| - | ===== Diary setup ===== | ||
| - | Before | + | \\ ===== Diary Settings ===== |
| + | |||
| + | Before | ||
| <WRAP 100%> | <WRAP 100%> | ||
| - | <WRAP 600px left> | ||
| - | {{gallery>: | ||
| - | </ | ||
| - | To open a diary settings window, press the button {{cs: | ||
| <WRAP clear /> | <WRAP clear /> | ||
| + | **Diary Settings** can be accessed in several ways: | ||
| + | * from the **Diary List** by clicking the pencil icon at the end of the row for the relevant diary, and then selecting the Diary Settings tab; | ||
| + | * if you are viewing the Daily Entries of a diary, simply click the **Diary Settings** button with the gear icon above the timeline, or | ||
| + | * select **Identification Details** in the left panel and then select the **Diary Settings** tab | ||
| + | The **Diary Settings** window contains tabs for configuring individual sections. The individual tabs are described below. | ||
| - | ** Diary set up** window contains several tabs. | ||
| - | ==== Main info ==== | + | \\ ==== Basic ==== |
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | The window contains data entered and explained in the diary creating help part. At the bottom part of the window, you can change the order of the diary sections using the arrows icons. The order changes for both the screen and the daily report in a PDF file. | ||
| - | <WRAP clear /> | ||
| + | **Time Limit for Signature ** - specifies the time in minutes for which a Daily Entry or Other Entry will be temporarily locked after the **Download for Signing** function is initiated. The temporary lock ends either with a permanent lock (i.e. by signing the entry or uploading the electronically signed entry back into the application) or when the configured time expires and the entry returns to its active state. A file uploaded after the time limit has expired will be rejected. | ||
| - | ==== Weather ==== | + | **Number of Signature fields** - specifies the number of signature fields at the end of the entry being signed. According to common practice, the daily report is signed by the Site Manager and the Technical Supervision Representative (TDS), so two signature fields are configured by default. The number |
| - | <WRAP 100%> | + | |
| - | <WRAP 600px left> | + | |
| - | {{gallery>: | + | |
| - | </ | + | |
| - | In this tab, you set the hours you want to record | + | |
| - | The daily report will generate a data row for each hour. | + | **Working Hours** - the contents of this field are automatically inserted into the note in the Labour section when the first entry is added to this section. |
| + | **Working Day Hours** - determines the number of working hours that will be offered by default for Labour and Plants in the Hours field. | ||
| - | ** Field Settings | + | **Other Entries Signature Check** - this field is checked by default and means that a day cannot be locked without signatures for all entries made by other people |
| + | |||
| + | **Attendance Import** - this section is displayed only if the domain is connected to an electronic attendance system. You can then select the relevant terminal at the given construction site and, if necessary, filter the subcontractor diaries | ||
| + | |||
| + | **Section Order** - allows you to change | ||
| <WRAP clear /> | <WRAP clear /> | ||
| - | ==== Labour, Plants, Materials, | + | |
| + | |||
| + | \\ ==== Individual Section Tabs - Common Information | ||
| <WRAP 100%> | <WRAP 100%> | ||
| <WRAP 600px left> | <WRAP 600px left> | ||
| - | {{gallery>: | + | {{gallery>: |
| </ | </ | ||
| - | All other tabs have the same behaviour. They always contain a full list of section | + | **Field Name** - You can change |
| - | By default, all fields are set to ** Standard field **, so all fields | + | **Abreviation** - allows you to change the text used in the daily report and in the mobile application. |
| - | If you want to reduce the number of data to enter, select ** Hidden field **. | + | |
| - | To ensure that the field is always | + | **Section Item Settings** – provides the list of available |
| - | < | + | |
| + | **Entry Timestamp** - displays the time when an entry was created and highlights entries created after the statutory deadline. It defines whether and how the entry timestamp should be displayed, with three options: | ||
| + | **Hide** = Do not display at all | ||
| + | **Show** = Simply display the date and time when the entry was created or last modified | ||
| + | **Required** | ||
| + | |||
| + | |||
| + | < | ||
| <WRAP tip > | <WRAP tip > | ||
| - | If you change any data, save it with the ** Save ** button. Each tab is saved separately. | + | If you change any setting, save it using the **Save** button. |
| + | </ | ||
| + | <WRAP clear /> | ||
| - | If you want to change | + | |
| + | |||
| + | \\ ==== Individual Section Tabs - Specific Information ==== | ||
| + | |||
| + | === Weather === | ||
| + | **Weather entry hours** - In this tab, you set the full-hour times at which you want weather data to be retrieved. The default values are 6:00, 12:00, and 18:00. You can add additional times using the code list by clicking the selected time, or remove a time from the selected hours using the x button. A row containing weather data will then be generated for each selected hour in the daily entries. | ||
| + | |||
| + | **Siotech Sensor** - enter the device ID in this field if you use an autonomous Siotech temperature sensor (see [[en: | ||
| + | |||
| + | === Works Performed and Other Entries === | ||
| + | |||
| + | In the Works Performed section, you can also enter records using budget items. To do this, you need to have the Project' | ||
| + | |||
| + | **Location** - displays a map showing the location | ||
| + | |||
| + | **Plan** - allows a drawing | ||
| + | |||
| + | |||
| + | |||
| + | <WRAP tip > | ||
| + | If you have a larger number of construction sites in Buildary and the default settings do not meet your needs, | ||
| </ | </ | ||
| + | |||