en:diary:diaryidentification
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| en:diary:diaryidentification [2024/10/07 13:56] – Lada Svobodová | en:diary:diaryidentification [2026/09/15 09:14] (current) – Milan | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== | + | ====== |
| - | Diary identification data represent Part A of the construction project diary. | + | The **Identification Details** |
| - | This part consists of the following | + | |
| - | - Project and diary title pages | + | The diary's Identification Details can be exported as a PDF at any time using the icon at the bottom of the Diary Cover Sheet. |
| - | - List of authorized persons and their roles in the project. | + | <WRAP 100%> |
| + | <WRAP 600px left> | ||
| + | {{en: | ||
| - | - List o project documents divided into four parts. | + | <WRAP 100%> |
| + | <WRAP 600px left> | ||
| + | {{en: | ||
| - | You can export diary identification data into the PDF file, using the icon at the bottom of the title page. | + | ===== Diary Cover Sheet ===== |
| - | {{en:diary:title_page1.png?600 |}}{{en: | + | <WRAP 100%> |
| + | <WRAP 600px left> | ||
| + | {{gallery>: | ||
| + | All information shown on the Diary Cover Sheet is described in detail in the **Creating and Setting Up a Diary** section. This information can be edited at any time. Changes must always be saved. | ||
| + | ===== Logos and Graphics ===== | ||
| - | ===== Diary title page ===== | + | <WRAP 100%> |
| + | <WRAP 600px left> | ||
| + | {{gallery>: | ||
| + | </ | ||
| + | In this window, you can select an **image for the diary cover sheet**. You can choose from three available options or upload your own image. Ideally, the recommended dimensions should be followed, but this is not required. The image will be automatically resized to fit. | ||
| - | All the information in the Diary title page is described in detail in the Diary set up part. Diary information can be edited at any time during | + | You can also configure |
| + | </ | ||
| - | {{: | ||
| - | ===== Authorized | + | ===== Authorized |
| - | In the diary, you need to create a list of Authorized persons who are responsible for the diary or are allowed to enter records in it. | + | <WRAP 100%> |
| - | In the Buildary application, | + | <WRAP 600px left> |
| + | {{gallery>: | ||
| + | </ | ||
| - | {{:en:diary: | + | The diary must contain a list of **Authorized Persons** who, under the law, either maintain the Construction Diary or have the right to enter records into it. |
| + | In Buildary, persons are selected for the diary from the **Project Team Members** list, which is maintained at the construction project level. | ||
| + | |||
| + | |||
| + | **Authorization to Perform Selected Activities in Construction** | ||
| + | \\ The list of Authorized Persons in the diary allows you to attach the relevant authorization documents to each person. Persons for whom this is required by law should include an authorization stamp and handwritten signature on the cover sheets of the Construction Diary. | ||
| + | |||
| + | Our system offers essentially the same solution. In the Authorized Person editor, accessible via the pencil icon at the end of the relevant person' | ||
| + | |||
| + | If a physical stamp is used, we recommend performing an **authorized conversion** of the document into electronic form and then uploading the converted document as an attachment. | ||
| + | |||
| + | <WRAP clear /> | ||
| + | |||
| + | <WRAP 100%> | ||
| + | <WRAP 600px left> | ||
| + | {{gallery>: | ||
| + | </ | ||
| + | |||
| + | The authorization document is automatically included as an attachment in the diary' | ||
| <WRAP clear /> | <WRAP clear /> | ||
| Line 33: | Line 64: | ||
| <WRAP info> | <WRAP info> | ||
| - | User permissions | + | A user' |
| </ | </ | ||
| - | A list of roles and its permission setting | + | The list of roles and their permissions |
| + | ===== Construction Certificates and Documents ===== | ||
| - | ===== Project documents ===== | + | <WRAP 100%> |
| + | <WRAP 600px left> | ||
| + | {{gallery>: | ||
| + | </ | ||
| + | The four sections contain records of all certificates and documents related to the construction project. The purpose of the individual fields is clear from their names. Electronic documents can also be attached to records. | ||
| - | Project documents are organized into four sections. The name of the section defines the content. The document can be just mentioned in the list or can be attached in electronic form. | + | <WRAP clear /> |
| - | {{: | + | ===== Diary Settings ===== |
| + | Diary settings are configured in the **[[: | ||