Drawings with task markers are another part of the task management module.
You can see drawings categorized by the structure of the construction project. You can select a specific drawing and view the already created markers with tasks.
You can also choose drawings using the dropdown menu in the filtering field „Filter by project section“ or by clicking on the drawing.
In the drawing, you can see all the markers of individual tasks.
You may not see tasks in two cases:
Thanks to the filters located just above the drawing, you can display only the tasks that interest you.
You can freely toggle the display of markers and tasks in drawings using these filters:
When you hover the mouse cursor over a specific marker, an information window with a basic task description will appear. This window includes a button labeled “View task details.” Clicking the button will open detailed task information, which you can edit based on your permissions.
The colors of the individual markers represent the status of the task, so you can immediately tell the current status of the task by its color:
Each marker is labeled with a two-letter abbreviation indicating the Category the task belongs to.