 **The aim of the Performed Works module is to cover the first two levels of contractor relationships, i.e. PWs between the contractor and the client, and between subcontractors and the contractor.** **The aim of the Performed Works module is to cover the first two levels of contractor relationships, i.e. PWs between the contractor and the client, and between subcontractors and the contractor.**
  
-{{ :cs:performedworks:diagram_vztahu2.png |}} <WRAP clear /> </WRAP>+{{ :en:performedworks:diagram_vztahu2.png |}} <WRAP clear /> </WRAP>
  
 <WRAP 1200px left> <WRAP 1200px left>
Line 33: Line 33:
 * The time period covered by the records can be set freely. It is configured by the construction site administrator and is shared by all participants. When integrating with other applications, however, it is advisable to respect any limitations resulting from the logic of those applications (e.g. in RSV, the period must not exceed one month). * The time period covered by the records can be set freely. It is configured by the construction site administrator and is shared by all participants. When integrating with other applications, however, it is advisable to respect any limitations resulting from the logic of those applications (e.g. in RSV, the period must not exceed one month).
  
-* Each participant creates their own **Measurement Report (MR)** for the given period. The report then progresses through individual statuses (**Draft, Approval, Proposal Change, Approved**). The functions available to different users also depend on the current status of the MR.+* Each participant creates their own **Measurement Report (MR)** for the given period. The report then progresses through individual statuses (**Proposal, Approved, Changed, Rejected, Negotiated**). The functions available to different users also depend on the current status of the MR.
  
 * Users are notified by e-mail of changes to the status of the Measurement Report. * Users are notified by e-mail of changes to the status of the Measurement Report.
  
-* Gradual approval of records of completed work at the individual item level. Each item quantity has its own status (**Draft, Approved, Approved with Changes, Rejected, Under Negotiation**), so some items may already be approved while the correct quantity for others is still being negotiated.+* Gradual approval of records of completed work at the individual item level. Each item quantity has its own status (**Proposal, Approved, Changed, Rejected, Negotiated**), so some items may already be approved while the correct quantity for others is still being negotiated.
  
 * Users have a continuous overview of the volume of completed work that has already been approved and the volume that is still undergoing the approval process. * Users have a continuous overview of the volume of completed work that has already been approved and the volume that is still undergoing the approval process.